INTERIM RESULTS FOR THE SIX MONTHS ENDED 30 JUNE 2018

 

Zanaga Iron Ore Company Limited ("ZIOC" or the "Company") (AIM: ZIOC) is pleased to announce its unaudited interim results for the six months ended 30 June 2018.

Highlights

·   Early Production Project ("EPP")

Positive product test results

Pellet feed concentrate results confirmed a premium product with an iron ore grade of 67.4% and low impurities is capable of being produced at the Zanaga Iron Ore Project ("Zanaga Project") from haematitic upper level orebody layers

Positive pellet test results from test work on pellets produced using new cold pelletisation technology with potential to provide significant cost benefits versus traditional pelletisation plants. Process launched by Jumelles, with support of Glencore, to ascertain commercial acceptability of Zanaga cold pellets with a range of  steel industry customers

Cost estimations being secured from pellet plant developers for the potential pelletisation component of the EPP project, including assessment of both cold pelletisation and traditional pelletisation solutions

Initial high level results indicate major capital and operating cost savings through the development of a cold pelletisation plant solution

High level cost estimates indicate that a traditional pelletisation plant solution may present a viable economic solution in spite of the higher costs

Logistics routes for the EPP project to two potential exit ports further defined - firm cost estimates under negotiation, with further results expected in Q4 2018

Study work underway to ascertain overall project feasibility and scope of operations with the objective of defining the EPP's economics

·   Port

Non-binding Letter of Intent ("LOI") submitted to China Road and Bridge Corporation (CRBC) by Mining Project Development Congo SAU ("MPD Congo") and other mining companies to support CRBC's discussions with Chinese funding institutions for the development of the new bulk mineral port at Pointe-Indienne, Republic of Congo

·   Appointment of Mr Jonathan Andrew Velloza ("Johnny Velloza") to the board of ZIOC as an Independent Non-Executive Director on 6 September 2018

·   Cash balance of US$3.0m as at 30 June 2018 and US$2.8m at 31 August 2018

Clifford Elphick, Non-Executive Chairman of ZIOC, commented:

"The first half of 2018 has been very positive for the Zanaga Iron Ore Project and the Company. Supported by its shareholders, Jumelles has made major progress in progressing the Zanaga Project through the definition of a small scale early production project solution (EPP Project). The EPP Project is made all the more attractive due to the potential ability to produce high grade iron ore products that are currently trading at a premium in the market. We're also cautiously optimistic about the positive results from the testing of the Zanaga product with a lower capital and operating cost cold pelletisation technology that has shown excellent results in its testing with a steel company and independent laboratories. The future of iron ore particularly lies in the production of high quality iron ore materials and the Zanaga Project is well aligned to benefit from that trend going forward.

We are also very pleased that Johnny Velloza has now joined the Board of ZIOC. Johnny's extensive operational experience in the mining industry, particularly in iron ore, will prove invaluable to the Company as the Zanaga Project advances through the next phase of technical study work.

We look forward to providing our shareholders with further updates on the Early Production Project as the cost estimates are received and compiled by the Zanaga project team."

 

Copies of the unaudited interim results for the six months ended 30 June 2018 are available on the Company's website at www.zanagairon.com

 

The Zanaga Iron Ore Company Limited LEI number is 21380085XNXEX6NL6L23.

 

For further information, please contact:

Zanaga Iron Ore

Corporate Development and                       Andrew Trahar

Investor Relations Manager                         +44 20 7399 1105

 

Liberum Capital Limited

Nominated Adviser, Financial                      Christopher Britton

Adviser and Corporate Broker                     and Richard Crawley

                                                                          +44 20 3100 2000

 

About us:

Zanaga Iron Ore Company Limited (AIM ticker: ZIOC) is the owner of 50% less one share in the Zanaga Iron Ore Project based in the Republic of Congo (Congo Brazzaville) through its investment in associate. The Zanaga Iron Ore Project is one of the largest iron ore deposits in Africa and has the potential to become a world-class iron ore producer.

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) No 596/2014.

 

 

 

Business Review - Operations

Cash Reserves and Project Funding

As already reported in the Company's annual results published on 29 June 2018, Glencore and ZIOC agreed a 2018 Project Work Programme and Budget for the Zanaga Project of US$1.3m plus US$0.2m of discretionary spend dependent on certain workstreams requiring capital. ZIOC agreed to contribute towards the work programme and budget an amount comprising US$0.7m plus 49.99% of all discretionary items approved jointly with Glencore. Ignoring any entitlement to savings, ZIOC's potential contribution to the Zanaga Project in 2018 is US$0.8m in total.

We are pleased to report that the Zanaga Project's activities are currently running in line with the 2018 budget forecast.

As at 31 August 2018, ZIOC had cash reserves of US$2.8m and the Board continues to take a very prudent approach to the management of the business.

Changes to the Board of Directors

Mr Jonathan Andrew Velloza ("Johnny Velloza") joined the board of ZIOC as an Independent Non-Executive Director following the Company's Annual General Meeting on 6 September 2018. Mr Velloza has a wealth of experience in the mining industry and is currently completing his tenure as Deputy CEO and COO of Gem Diamonds Ltd. Prior to this, he was with BHP Western Australia Iron Ore where he was General Manager at Mining Area C, the largest iron ore mine in the BHP portfolio, from 2013 to 2015, leading a number of successful operational efficiency programs. He has also acted as a Senior Exploration Manager in Zambia and Chile for BHP from 2011-2013, Operations Manager at AngloGold Ashanti from 2009-2010 and held numerous managerial positions at De Beers from 2001-2009.

Mr Velloza, aged 47, holds a Bachelor's degree in Mining Engineering from The University of Johannesburg and a Bachelor's degree in Business from The University of South Africa.

In addition, Mr Michael Haworth stepped down as a Director to focus on other business commitments and retired at the Company's Annual General Meeting on 5 September 2018.

Early Production Project Assessment (EPP)

As part of the Company's annual results published on 29 June 2018, the Company provided a comprehensive update on progress relating to investigations into the potential for development of a low capital cost project utilising existing road, rail and port transportation infrastructure. The project is envisaged to mine and beneficiate Zanaga's haematitic surface ores and produce either (a) high quality iron ore pellet feed concentrate, or (b) high quality iron ore pellets. Both of the target products would be expected to receive significant price premiums in the iron ore market.

The Zanaga Project Team have made significant progress in testing a new form of iron ore pellet, produced using a lower capital and operating cost technology, the results of which have been announced to shareholders on 29 June 2018 and 7 August 2018.

Following the success of the cold pelletisation test work, Jumelles, supported by ZIOC and Glencore, has commenced a process to assess customer acceptance of these new iron ore pellets.  This process includes engaging with steel mills who might become substantial consumers of this product.  As part of this process, Jumelles as a member of the Glencore group has the opportunity to utilise  Glencore's extensive Iron Ore trading network.

Due to the continued rise in premiums for high quality iron ore pellets, the Zanaga Project team also commenced the process of securing capital and operating cost estimates for a conventional pelletisation solution for the Zanaga Project. It is encouraging to see the progress that is being made on establishing the viability of developing this solution for the EPP Project, and initial estimates provided to the Zanaga Project team indicate that an additional degree of optionality could be available in determining the potential viability of the EPP project using conventional pelletisation solutions.

As indicated previously, the Company and its associate Jumelles intend to be in a position to provide more detail on the outcomes of the study work by the end of this year including an economic assessment of the viability of the EPP project.

Cold pelletisation test results

On 30 June 2018, ZIOC announced the significant progress made in the Zanaga Iron Ore Project's pelletisation test work programme aimed at producing an industry acceptable iron ore pellet product using a lower cost cold pelletisation process. The results showed that the most recent batches of Zanaga cold pellets had met all industry standard tests as determined by independent third party laboratories.

Test work was then commissioned with the intention of ascertaining commercial acceptability in the steel production process. Two further 20kg samples of Zanaga cold pellets were sent to a European steel mill as well as an accredited European laboratory servicing the steel industry. The tests conducted by these independent laboratories returned positive results within the industry acceptable limits for conventional pellets.

These tests were undertaken by Jumelles, the joint venture between the Company and Glencore, as part of the overall initiative to establish the viability of an Early Production Project (EPP) as described in the Company's Annual Report released on 30 June 2018. As part of the ongoing work-streams, discussions are taking place with steel mills to consider further steps and tests that need to be taken in order to assess potential demand and pricing for Zanaga pellets and pellet feed concentrate.

Iron Ore Market

Iron ore prices have continued to be supported by robust demand from the steel industry in the first half of 2018. It is particularly encouraging that price premiums for high quality iron ore products, especially pellet feed concentrates and pellets themselves, have increased over the period supported by China's sustained drive to improve steel manufacturing efficiency and reduce pollution.

We do not expect major increases in supply of iron ore, and particularly not in high quality products with low impurities. We expect the structural shift in demand for high quality products to remain for the foreseeable future and the supply base to be unable to meet it for some time.

New Mineral Port in Pointe-Indienne

In March 2013, the RoC signed a Memorandum of Understanding with China Communications Construction Company ("CCCC"), and its subsidiary China Road and Bridge Corporation ("CRBC"), for the development of a new multi-user port facility 9km north of the existing port of Pointe-Noire at Pointe Indienne, including a deepwater bulk export facility for the iron ore industry. CRBC has conducted a significant amount of work on this major project, including a feasibility study on the port development.

ZIOC notes that there is still discussion between the RoC Government, China EXIM Bank and China Road and Bridge Corporation (CRBC) on the financing and development plan for the new bulk materials port development north of Pointe Noire.

Advancement of the new port development could provide a key catalyst in allowing the Zanaga 12Mtpa Stage One development project to derisk and proceed towards seeking finance.

CRBC has confirmed to the Zanaga Project team that it is engaged in discussions with Chinese funding institutions on the development of the New Mineral Port at Pointe-Indienne.

ZIOC confirms that a non-binding LOI has been provided to CRBC by Jumelles' subsidiary, MPD Congo, and four other mining companies to support the development of this port; this LOI outlines the need to hold discussions with CBRC to determine an economically and technical viable development of the new port in alignment with the needs of the mining companies.

Outlook and next steps

The global iron ore market continues to show strong demand fundamentals and solid support for high quality products such as Zanaga would produce.

The Zanaga Project Team have done an excellent job in progressing the definition of the EPP Project and advancing its economic assessment. The Zanaga project has always targeted the production of premium quality products and we remain focused on this strategy, including the potential to extend the product development plan through to the production of high quality pellet feed or pellets.

While port and power arrangements remain a challenge, the Zanaga Project Team continue to engage with stakeholders on the new mineral port as well as the opportunities presented by the extension of the port of Pointe Noire itself.

We look forward to providing further information to shareholders towards the end of 2018.

Financial review

Results from operations

The financial statements contain the results for ZIOC for the first half of 2018. ZIOC made a loss in the half-year of US$0.8m compared to a loss of US$1.4m in the full year ended December 2017. The loss for the 2018 half-year period comprised:

 

 

1 January to
30 June
2018

Unaudited

US$000

1 January to
30 June
2017

Unaudited

US$000

1 January to
31 December
2017

Audited
US$000

General expenses

(416)

(357)

      (943)

Net foreign exchange (loss)/gain

(64)

242

       366

Share of loss of associate

(354)

(382)

        (824)

Interest income

3

3

8

(Loss)/Gain before tax

(831)

(494)

      (1,393)

Tax

 

-

        -

Currency translation

(13)

-

        52

Share of other comprehensive income of associate - foreign exchange

(9)

(84)

     (48)

Total Comprehensive income

(853)

(578)

(1,389)

 

General expenses of US$0.4m (2017: US$0.4m), Directors' fees of US$0.1m (2017: US$0.1m), professional fees of US$0.2m (2017: US$0.2m) and US$0.1m (2017: US$0.1m) of other general operating expenses.

 

The share of loss of associate of US$0.35m (2017: US$0.4m) relates to ZIOC's investment in Jumelles Limited ("Jumelles"), the joint venture company in respect of the Zanaga Project. From May 2014, as a result of the completion of the Feasibility Study and thus consideration to complete the Glencore share option, only 50% (less one share) of the Jumelles results are now included above.

During the half year period, Jumelles' project expenditure was US$0.7 including the effects of currency translation of $0.01m loss. Capitalised exploration assets however, remain at US$80.0m.

 

 

 

Financial position

ZIOC's net asset value ("NAV") of US$40.5m is comprised of a US$37.5m investment in Jumelles and US$3.0m of cash balances.

 

 

30 June 2018

Unaudited
US$
m

30 June 2017

Unaudited
US$
m

31 December 2017

Audited
US$m

Investment in associate

37.5

37.6

37.9

Fixed assets

-

-

-

Cash

3.0

4.4

4.9

Other net current assets/(liabilities)

-

0.1

(0.1)

Net assets

40.5

42.1

42.7

 

Cost of investment

The investment in associate relates to the carrying value of the investment in Jumelles, which as at 30 June 2018 owned 50% less one share of the Project. The carrying value of this investment is unchanged in 2018 due to:

·     Company funding per the Supplemental Agreements of US$0. 3m; and

·     The Company's US$0.35m share of the comprehensive loss US$ 0.7m made by Jumelles during the half-year.

As at 30 June 2018, Jumelles had aggregated assets of US$81.7m (June 2017: US$82.1m) and aggregated liabilities of US$0.8m (June 2017: US$0.8m). Non-current assets consisted of US$80.0m (June 2017: US$80.0m) of capitalised exploration assets and US$1.4m (June 2017: US$1.7m) of other fixed assets including property, plant and equipment. Cash balances amounted to US$0.3m (June 2017: US$0.4m) and other current assets were US$0.1m (June 2017: US$0.1m).

 

Cash flow

 

Cash balances have decreased by US$0.7m since 31 December 2017. Additional investment in Jumelles required under Funding Agreements (details set out in note 1 to the financial statements) utilised US$0.3m, operating activities US$0.3m, and foreign exchange losses were US$0.1m as the value of UK Sterling weakened against the US Dollar, thus decreasing the US Dollar value of the UK Sterling denominated cash balances.

 

30 June 2018

Unaudited
US$000

30 June 2017

Unaudited
US$000

31 December 2017

Audited
US$000

GBP Balances

2.3

3.4

2.7

USD value of GBP balances

3.0

4.4

3.7

USD value of other currencies

-

-

-

USD balances

-

-

-

Cash Total

3.0

4.4

3.7

 

Consolidated Statement of Comprehensive Income for the six months ended 30 June 2018 

 

Note

1 January
to

30 June 2018

Unaudited

 US$000

1 January
to

30 June 2017

Unaudited

 US$000

1 January 

 to
31 December 2017

Audited

US$000

Administrative expenses

 

(480)

(115)

(577)

Share of (loss)/profit associate

 

(354)

(382)

(824)

Operating loss

 

(834)

(496)

(1,401)

Interest Income

 

3

3

8

(Loss) before tax

 

(831)

(494)

(1,393)

Taxation

5

-

-

-

(Loss) for the period

 

(831)

(494)

(1,393)

Foreign exchange translation - foreign operations

 

(13)

-

52

Share of other comprehensive (loss)/income of associate - foreign exchange translation

 

 

(9)

 

(84)

(48)

Other comprehensive (loss)/gain

 

(22)

(84)

4

Total comprehensive (loss)/gain

 

(853)

(578)

(1,389)

(Loss)/Earnings per share (Cents)

 

 

 

 

Basic

7

(0.3)

(0.2)

(0.5)

Diluted

7

(0.3)

(0.2)

(0.5)

The loss for the period is attributable to the equity holders of the parent company. All other comprehensive income may be classified as profit and loss in the future.

 

Consolidated Statement of changes in equity

for the six months ended 30 June 2018

 

 

 

 

Foreign

 

 

 

 

currency

 

 

Share

Retained

translation

Total

 

capital

earnings

reserve

Equity

 

US$000

US$000

US$000

US$000

Balance at 1 January 2017

       267,012

       (227,662)

       3,322

42,672

Consideration for share-based payments - other services

-

 -

 -

-

Share buy backs

 -

 -

 -

 -

Loss for the period

 -

(494) 

 -

(494)

Other comprehensive (loss)/ income

 -

 -

(84)

(84) 

Total comprehensive (loss)/income

       -

(494)

      984)

       (578)

Balance at 30 June 2017

       267,012

       (228,156)

       3,238

       42,094

Consideration for share-based payments - other services

 

 -

 -

 

Share buy backs

 -

 -

 -

 -

Loss for the period

 -

(899)

 -

 (899)  

Other comprehensive (loss)/income

 -

 -

88

88 

Total comprehensive (loss)/income

       -

       (899)

     88 

      (811)

Balance at 31 December 2017

       267,012

       (229,055)

       3,326

41,283

Consideration for share-based payments - other services

-

 -

 -

-

Share buy backs

 -

 -

 -

 -

Loss for the period

 -

(831) 

 -

(831)

Other comprehensive (loss)/income

 -

 -

(22)

(22) 

Total comprehensive loss

       -

(831)

      (22)

       (853)

 

Balance at 30 June 2018

267,012

 (229,886)

3,304

40,430

                                                                                                                                                                  

 

 

Consolidated Balance sheet

as at 30 June 2018

 

 

 

30 June 2018 Unaudited

30 June 2017

Unaudited

31 December 2017

Audited

 

Note

US$000

US$000

US$000

Non-current asset

 

 

 

 

Property, plant and equipment

 

-

-

-

Investment in associate

6

37,518

37,636

37,589

 

 

37,518

37,636

37,589

Current assets

 

 

 

 

Other receivables

 

38

65

49

Cash and cash equivalents

 

2,949

4,435

3,721

 

 

2,987

4,500

3,770

Total Assets

 

40,505

42,136

41,359

Current liabilities

 

 

 

 

Trade and other payables

 

(75)

(42)

(75)

Net assets

 

40,430

42,094

41,284

Equity attributable to equity holders of the parent

 

 

 

 

Share capital

 

267,012

267,012

267,012

Retained earnings

 

(229,886)

(228,156)

(229,055)

Foreign currency translation reserve

 

3,304

3,238

3,327

Total equity

 

40,430

42,094

41,284

These financial statements were approved by the Board of Directors on 27 September 2018.

 

 

 

Consolidated Cash flow statement

for the six months ended 30 June 2018

 

 

 

1 January

1 January

1 January

 

 

to

to

To

 

 

30 June

30 June

31 Dec

 

 

20187

Unaudited

2017

Unaudited

2017

Audited

 

 

US$000

US$000

US$000

Cash flows from operating activities

 

 

 

 

Loss for the year

 

(831)

(494)

(1,393)

Adjustments for:

 

 

 

 

Depreciation

 

-

-

-

Interest received

 

(3)

(3)

(8)

Taxation expense

 

-

-

-

Decrease in other receivables

 

(3)

(6)

11

Decrease in trade and other payables

 

-

(71)

(38)

Net exchange (profit)/loss

 

64

(242)

(313)

Gain on part sale of associate

 

-

-

-

Share of Total Comprehensive income of associate

 

354

382

824

Impairment to share of investment in associate

 

-

-

-

Share-based payments

 

-

-

-

Tax paid

 

-

-

-

Net cash from operating activities

 

(419)

(434)

917

Cash flows from financing activities

 

 

 

 

Repurchase of own shares

 

-

-

-

Net cash from financing activities

 

-

-

-

Cash flows from investing activities

 

 

 

 

Interest received

 

3

3

8

Acquisition of property, plant and equipment

 

-

-

-

Investment in associate

 

(292)

(229)

(588)

Net cash from investing activities

 

(289)

(226)

(580)

Net decrease in cash and cash equivalents

 

(708)

(660)

(1,497)

Cash and cash equivalents at beginning of period

 

3,721

4,852

4,852

Effect of exchange rate difference

 

(64)

242

366

Cash and cash equivalents at end of period

 

2,949

4,434

3,721

 

Notes to the financial statements

1. Business information and going concern basis of preparation

In common with many exploration and development companies in the mining sector, the Company raises funding in phases as its projects develop.

Following completion of the Feasibility Study in April 2014, modified to a staged development basis under the terms of the Supplemental Agreement announced on 13 September 2013, the consideration for the Call Option whereby Glencore owns 50% plus one share shareholding in the project, is now satisfied. The Mining Licence was granted in August 2014 and a Mining Convention was signed with the Government of the Republic of Congo.  This has now been ratified by the Republic of Congo and adopted as law. Under the 2018 funding agreement entered into by the Company and Glencore, the Company's funding obligations for the 2018 work programme and budget are for a sum of US$0.65m, plus a percentage share of discretionary costs.  Such share for the Company would be US$0.11m if all the discretionary costs were approved jointly by the Company and Glencore. On current projections, it is estimated that the cash amounts payable by the Company to Jumelles during 2018 will be between approximately US$0.65m and US$0.76m. As regards ZIOC's corporate costs for the 2018 financial year, it is estimated that such costs will be of the order of US$0.6m and US$0.8m. The directors have a reasonable expectation that the Company has adequate financial resources to continue in operational existence for the foreseeable future, being a period of at least twelve months from the date of approval of these half-yearly financial statements. For these reasons, the financial statements of the Company have been prepared on a going concern basis.

2. Accounting policies

The principal accounting policies applied in the preparation of these financial statements are set out below. These policies have been consistently applied to all the periods presented, unless otherwise stated.

3. Basis of preparation

The condensed set of financial statements has been prepared in accordance with IAS 34 Interim Financial Reporting as adopted by the EU.

In accordance with the AIM Rules for Companies, the condensed set of financial statements has been prepared in applying the accounting policies and presentation that were applied in the preparation of the Company's published consolidated financial statements for the year ended 31 December 2017. The comparative figures for the financial year ended 31 December 2017 are not the Company's statutory accounts for that financial year. The 2017 accounts have been reported on by the Company's auditors. The report of the auditors was (i) unqualified and (ii) did not include a reference to any matter to which the auditors drew attention by way of emphasis without qualifying their report.

Up until 30 April 2014, the Company accounted for 100% of the Jumelles group Comprehensive Income. From May 2014, as a result of completion of the Feasibility Study (note 1 above) and thus consideration to complete the Call Option, the Company has accounted for 50% less one share shareholding portion of that Comprehensive Income.

4. Segmental reporting

The Company has one operating segment, being its investment in the Zanaga Project, held through Jumelles. Financial information regarding this segment is provided in note 6.

 

 

 

5. Taxation

The Company is exempt from most forms of taxation in the British Virgin Islands ("BVI"), provided the Company does not trade in the BVI and does not have any employees working in the BVI. All dividends, interest, rents, royalties and other expense amounts paid by the Company, and capital gains realised with respect to any shares, debt obligations or other securities of the Company, are exempt from taxation in the BVI.

 

 

30 June 2018

 Unaudited

30 June 2017

Unaudited

31 December 2017

Audited

 

US$000

US$000

US$000

Recognised in profit and loss:

 

 

 

Current year

-

-

-

 

 

 

 

Reconciliation of effective tax rate

 

 

 

Profit/(Loss) before tax

(831)

(494)

(1,393)

Income tax using the BVI corporation tax rate of 0% (2015: 0%)

-

-

-

Effect of tax rate in foreign jurisdictions

-

-

-

The effective tax rate for the Group is 0.00% (December 2017: 0.00%).

 

6. Investment in associate

 

 

US$000

Balance at 1 January 2017

37,873

Additions

229

Share of comprehensive loss

(466)

Balance at 30 June 2017

37,636

Additions

359

Share of  comprehensive loss

(406)

Balance at 31 December 2017

37,589

Additions

292

Share of comprehensive loss

(363)

Balance at 30 June 2018

37,518

From 30 April 2014, the investment represents a 50% less one share shareholding (previously 100%) in Jumelles for 2,000,000 shares of 4,000,001 total shares in issue.

On 11 February 2011, Xstrata Projects (now renamed Glencore Projects) exercised the Xstrata Call Option and from that date owns 50% plus one share of Jumelles and Jumelles is controlled at both a shareholder and director level by Glencore Projects. However, as the shares issued on exercise of the option were not considered to vest until provision of the services relating to the Preliminary Feasibility Study and the Feasibility Study had been completed, the Group continued to account for a 100% interest in Jumelles until the Feasibility Study was completed in April 2014. From May 2014 the Group has accounted for the reduction of its interest in Jumelles. The Group's interest remains accounted for as an associate using the equity method of accounting.

The Group financial statements account for the Glencore Projects transaction as an in-substance equity-settled share-based payment for the provision of services by Glencore Projects to Jumelles in relation to the Preliminary Feasibility Study and the Feasibility Study. These services largely were provided through third party contractors and were measured at the cost of the services provided.

As at 30 June 2018, Jumelles had aggregated assets of US$81.7m (June 2017: US$82.1m) and aggregated liabilities of US$0.8m (June 2017: US$0.8m). For the 6 months ended 30 June 2018, Jumelles incurred no taxation charge (June 2017: US$nil). A summarised consolidated balance sheet of Jumelles for the 6 months ended 30 June 2018, including adjustments made for equity accounting, is included below:

 

30 June

2018

Unaudited
US$000

30 June

2017

Unaudited
US$000


31 December

2017

Audited

US$000

Non-current assets

 

 

 

Property, plant and equipment

1,403

1,697

1,519

Exploration and other evaluation assets

80,000

80,000

80,000

Total non-current assets

81,403

81,697

81,519

Current assets

320

495

355

Current liabilities

(763)

(838)

(772)

Net current liabilities

(443)

(343)

(417)

Net assets

80,960

81,354

81,103

Share capital

337,627

337,627

338,190

Translation reserve

(4,841)

(4,894)

(4,823)

Retained earnings

 

(251,379)

(252,264)

 

80,960

81,354

81,103

 

 

7. Earnings per share

 

 

30 June

2018

Unaudited

US$000

30 June

2017

Unaudited

US$000

31 December 2017

Audited

US$000

Profit/(Loss) (Basic and diluted) (US$000)

(831)

(1,393)

Weighted average number of shares (thousands)

 

 

 

Basic and diluted

 

 

 

Issued shares at beginning of period

283,201

278,777

278,777

Effect of shares issued

-

-

-

Effect of share repurchase

-

-

-

Effect of own shares

-

(3,842)

(3,842)

Effect of share split

-

-

-

Weighted average number of shares at end of period - basic

283,210

274,935

274,935

 (Loss)/Earnings per share (Cents)

 

 

 

Basic

(0.3)

(0.2)

(0.5)

Diluted

(0.3)

(0.2)

(0.5)

 

8. Related parties

The following transactions occurred with related parties during the period:

 

 

 

Transactions for the period

 

 

Closing balance

 

 

30 June

2018

Unaudited

30 June

2017

Unaudited

31 December

2017

Audited

 

 

30 June

2018

Unaudited

30 June

2017

Unaudited

31 December

2017

Audited

 

US$000

US$000

US$000

 

US$000

US$000

US$000

Funding:

To Jumelles Limited

292

229

589

 

 

35

 

35

33

 

--------------------------------

 

 

 

 

 

 

 

 

 

 

 


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 